Gannawarra Solar Farm is a photovoltaic solar power station in the Gannawarra Shire, 13 kilometres (8.1 mi) west of Kerang in the Australian state of Victoria. It generates up to 60 MWdc electricity and exports up to 50.61 MWAC to the National Electricity Market at 66 kV. The Gannawarra Solar Farm is integrated with the Gannawarra Energy Storage System consisting of a 25 MW / 50 MW·h Tesla Powerpack battery. This project was developed and is 50.01% owned by Edify Energy, who also manage this project.
rdf:langString
rdf:langString
Gannawarra Solar Farm
rdf:langString
Gannawarra Solar Farm
rdf:langString
Gannawarra Solar Farm
xsd:float
-35.73545837402344
xsd:float
143.78173828125
xsd:integer
58066598
xsd:integer
1010309342
rdf:langString
PV
rdf:langString
Australia
xsd:integer
13
rdf:langString
April 2018
xsd:string
-35.735459 143.781739
rdf:langString
Gannawarra Solar Farm is a photovoltaic solar power station in the Gannawarra Shire, 13 kilometres (8.1 mi) west of Kerang in the Australian state of Victoria. It generates up to 60 MWdc electricity and exports up to 50.61 MWAC to the National Electricity Market at 66 kV. Solar Choice was the originating developer of the Gannawarra Solar Farm securing the site and early-stage development approvals before the project was acquired by Edify Energy. It was first connected to the grid by Powercor Australia in April 2018. It is 94.9% owned by WIRSOL, a brand of and 5.1% owned by the developer who is also the longterm asset manager of the project. It consists of JA Solar modules with ATI DuraTrack mounting system and SMA 2500 SC-EV inverters. It was financed in a single package with the and , both in Queensland, which projects were also developed and are managed by Edify Energy. The engineering, procurement, and construction was provided by RCR Tomlinson. The Gannawarra Solar Farm is integrated with the Gannawarra Energy Storage System consisting of a 25 MW / 50 MW·h Tesla Powerpack battery. This project was developed and is 50.01% owned by Edify Energy, who also manage this project.
xsd:integer
118
<perCent>
26.6
xsd:double
50.61