Das Pumpspeicherkraftwerk Fengning ist ein derzeit im Bau befindliches Pumpspeicherkraftwerk in der Provinz Hebei, China. Mit der Errichtung des Kraftwerks wurde im Mai 2013 begonnen. Das Kraftwerk soll in zwei Phasen errichtet werden und soll laut Plan 2021 fertiggestellt sein.[veraltet] rdf:langString
The Fengning Pumped Storage Power Station is a pumped-storage hydroelectric power station about 145 km (90 mi) northwest of Chengde in Fengning Manchu Autonomous County of Hebei Province, China. Construction on the power station began in June 2013 and the first generator was commissioned in 2019, the last in 2021. Project cost was US$1.87 billion. On 1 April 2014 Gezhouba Group was awarded the main contract to build the power station. It will be constructed in two 1,800 MW phases. It was completed in late 2021, and became the largest pumped-storage power station in the world with an installed capacity of 3,600 MW. rdf:langString
rdf:langString Fengning Pumped Storage Power Station
rdf:langString Pumpspeicherkraftwerk Fengning
rdf:langString Fengning Pumped Storage Power Station
rdf:langString Fengning Pumped Storage Power Station
xsd:float 41.66621017456055
xsd:float 116.5287857055664
xsd:integer 43346488
xsd:integer 1077670594
<usDollar> 1.87E9
rdf:langString China
xsd:integer 2019
rdf:langString O
xsd:string 41.66620833333333 116.52878611111112
rdf:langString Das Pumpspeicherkraftwerk Fengning ist ein derzeit im Bau befindliches Pumpspeicherkraftwerk in der Provinz Hebei, China. Mit der Errichtung des Kraftwerks wurde im Mai 2013 begonnen. Das Kraftwerk soll in zwei Phasen errichtet werden und soll laut Plan 2021 fertiggestellt sein.[veraltet]
rdf:langString The Fengning Pumped Storage Power Station is a pumped-storage hydroelectric power station about 145 km (90 mi) northwest of Chengde in Fengning Manchu Autonomous County of Hebei Province, China. Construction on the power station began in June 2013 and the first generator was commissioned in 2019, the last in 2021. Project cost was US$1.87 billion. On 1 April 2014 Gezhouba Group was awarded the main contract to build the power station. It will be constructed in two 1,800 MW phases. It was completed in late 2021, and became the largest pumped-storage power station in the world with an installed capacity of 3,600 MW. The lower reservoir will hold up to 66,150,000 m3 (53,630 acre⋅ft) of water of which 41,480,000 m3 (33,630 acre⋅ft) can be used for power generation. The upper reservoir will withhold up to 48,830,000 m3 (39,590 acre⋅ft) of water of which 40,610,000 m3 (32,920 acre⋅ft) can be used for power generation. Water from the upper reservoir is sent to the underground power station down near the lower reservoir.
xsd:integer 2013
rdf:langString Fengning Lower
<terawattHour> 3.424
<megawatt> 3600.0
rdf:langString 425 m
rdf:langString Francis pump turbines
rdf:langString Phase 1: 6 x 300 MW
rdf:langString Phase 2: 6 x 300 MW
<gigawattHour> 40.0
rdf:langString Fengning Upper
xsd:gYear 2013
xsd:nonNegativeInteger 3928
xsd:string 2013
xsd:gYear 2019