Fengning Pumped Storage Power Station
http://dbpedia.org/resource/Fengning_Pumped_Storage_Power_Station an entity of type: Thing
Das Pumpspeicherkraftwerk Fengning ist ein derzeit im Bau befindliches Pumpspeicherkraftwerk in der Provinz Hebei, China. Mit der Errichtung des Kraftwerks wurde im Mai 2013 begonnen. Das Kraftwerk soll in zwei Phasen errichtet werden und soll laut Plan 2021 fertiggestellt sein.[veraltet]
rdf:langString
The Fengning Pumped Storage Power Station is a pumped-storage hydroelectric power station about 145 km (90 mi) northwest of Chengde in Fengning Manchu Autonomous County of Hebei Province, China. Construction on the power station began in June 2013 and the first generator was commissioned in 2019, the last in 2021. Project cost was US$1.87 billion. On 1 April 2014 Gezhouba Group was awarded the main contract to build the power station. It will be constructed in two 1,800 MW phases. It was completed in late 2021, and became the largest pumped-storage power station in the world with an installed capacity of 3,600 MW.
rdf:langString
rdf:langString
Fengning Pumped Storage Power Station
rdf:langString
Pumpspeicherkraftwerk Fengning
rdf:langString
Fengning Pumped Storage Power Station
rdf:langString
Fengning Pumped Storage Power Station
xsd:float
41.66621017456055
xsd:float
116.5287857055664
xsd:integer
43346488
xsd:integer
1077670594
<usDollar>
1.87E9
rdf:langString
China
xsd:integer
2019
rdf:langString
O
xsd:string
41.66620833333333 116.52878611111112
rdf:langString
Das Pumpspeicherkraftwerk Fengning ist ein derzeit im Bau befindliches Pumpspeicherkraftwerk in der Provinz Hebei, China. Mit der Errichtung des Kraftwerks wurde im Mai 2013 begonnen. Das Kraftwerk soll in zwei Phasen errichtet werden und soll laut Plan 2021 fertiggestellt sein.[veraltet]
rdf:langString
The Fengning Pumped Storage Power Station is a pumped-storage hydroelectric power station about 145 km (90 mi) northwest of Chengde in Fengning Manchu Autonomous County of Hebei Province, China. Construction on the power station began in June 2013 and the first generator was commissioned in 2019, the last in 2021. Project cost was US$1.87 billion. On 1 April 2014 Gezhouba Group was awarded the main contract to build the power station. It will be constructed in two 1,800 MW phases. It was completed in late 2021, and became the largest pumped-storage power station in the world with an installed capacity of 3,600 MW. The lower reservoir will hold up to 66,150,000 m3 (53,630 acre⋅ft) of water of which 41,480,000 m3 (33,630 acre⋅ft) can be used for power generation. The upper reservoir will withhold up to 48,830,000 m3 (39,590 acre⋅ft) of water of which 40,610,000 m3 (32,920 acre⋅ft) can be used for power generation. Water from the upper reservoir is sent to the underground power station down near the lower reservoir.
xsd:integer
2013
rdf:langString
Fengning Lower
<terawattHour>
3.424
<megawatt>
3600.0
rdf:langString
425 m
rdf:langString
Francis pump turbines
rdf:langString
Phase 1: 6 x 300 MW
rdf:langString
Phase 2: 6 x 300 MW
<gigawattHour>
40.0
rdf:langString
Fengning Upper
xsd:gYear
2013
xsd:nonNegativeInteger
3928
xsd:string
2013
xsd:gYear
2019
xsd:string
O
<Geometry>
POINT(116.52878570557 41.666210174561)