Emerald Express

http://dbpedia.org/resource/Emerald_Express an entity of type: Thing

The Emerald Express (EmX) is a bus rapid transit (BRT) system in the Eugene-Springfield metropolitan area in Oregon, United States. It is provided by the Lane Transit District (LTD) which is the public transit authority in Lane County, Oregon. LTD chose bus rapid transit after a review process in which several transportation options, including light rail, were considered. It was decided that the BRT option was the best fit for Eugene-Springfield's size and current transportation needs. rdf:langString
rdf:langString Emerald Express
xsd:integer 4031415
xsd:integer 1121203788
xsd:integer 37
rdf:langString Green Line, Gateway Line
<second> -1200.0
rdf:langString Eugene and Springfield, Oregon
rdf:langString EmX logo.png
xsd:integer 150
rdf:langString collapsed
rdf:langString Emerald Express
xsd:date 2007-01-14
rdf:langString Commerce Station
rdf:langString Operational
rdf:langString West 11th Avenue, Franklin Boulevard, Pioneer Parkway
rdf:langString The Emerald Express (EmX) is a bus rapid transit (BRT) system in the Eugene-Springfield metropolitan area in Oregon, United States. It is provided by the Lane Transit District (LTD) which is the public transit authority in Lane County, Oregon. LTD chose bus rapid transit after a review process in which several transportation options, including light rail, were considered. It was decided that the BRT option was the best fit for Eugene-Springfield's size and current transportation needs. The first route, named the Green Line, was opened in early 2007, connecting downtown Springfield to downtown Eugene. There are ten stops along the 4-mile (6.4 km) route, including the University of Oregon. Less than a year later, ridership had doubled in the corridor, and the city of Eugene was nominated for the 2008 Sustainable Transportation Award, and received an honorable mention. An extension was opened on January 9, 2011, connecting EmX to the Gateway Mall as well as Sacred Heart Medical Center at RiverBend and . A second extension to West Eugene opened on September 17, 2017, adding 9 miles (14 km) to the system. The Institute for Transportation and Development Policy (ITDP), under its BRT Standard, has given the EmX corridor a Bronze ranking.
<second> -1800.0
rdf:langString Route 11 Thurston
xsd:nonNegativeInteger 21126

data from the linked data cloud