East San Fernando Light Rail Transit Project
http://dbpedia.org/resource/East_San_Fernando_Light_Rail_Transit_Project an entity of type: Thing
The East San Fernando Light Rail Transit Project (formerly the East San Fernando Valley Transit Corridor Project) is a proposed light rail transit corridor in Los Angeles's San Fernando Valley, running on a north/south route along Van Nuys Boulevard and San Fernando Road. Metro selected its preferred route as light rail without tunneling, "Alternative Six". The final Environmental Impact Report is currently in progress and the light rail line is scheduled for construction in mid 2023 with a completion of 2028.
rdf:langString
rdf:langString
East San Fernando Light Rail Transit Project
rdf:langString
East San Fernando Light Rail Transit Project
rdf:langString
East San Fernando Light Rail Transit Project
xsd:integer
57675349
xsd:integer
1116978515
xsd:integer
14
rdf:langString
Planned Route in Los Angeles, CA with its planned stations.
xsd:integer
2
rdf:langString
uncollapsed
rdf:langString
Planned
xsd:integer
2
rdf:langString
The East San Fernando Light Rail Transit Project (formerly the East San Fernando Valley Transit Corridor Project) is a proposed light rail transit corridor in Los Angeles's San Fernando Valley, running on a north/south route along Van Nuys Boulevard and San Fernando Road. Metro selected its preferred route as light rail without tunneling, "Alternative Six". The final Environmental Impact Report is currently in progress and the light rail line is scheduled for construction in mid 2023 with a completion of 2028. The project is being planned by the Los Angeles County Metropolitan Transportation Authority (Metro). The line has been given high priority by Metro in its long range plan, and funding for the project is included in Measure R and Measure M.The project's timeline was accelerated under the Twenty-eight by '28 initiative. In June 2018, Metro staff recommended the corridor be built as an at-grade rail line, making it a part of the Los Angeles Metro Rail system. In December 2020, Metro approved the Final EIR with the option to build the rail line in segments.
rdf:langString
median-running at grade
xsd:double
14805.9648
xsd:nonNegativeInteger
14
xsd:nonNegativeInteger
16087
xsd:string
Planned