Early contractor involvement

http://dbpedia.org/resource/Early_contractor_involvement

Early contractor involvement (ECI) is a type of construction contract where the principal contractor is engaged at an early stage in a project to offer input into the design phase. It is in contrast to the design–bid–build model where the contractor is only brought onboard at the end of the design phase. The model allows the contractor to have an input in the design of the scheme and suggest value engineering changes. Studies have shown that savings of around 10% in construction phase time and 7% in cost are achievable through the use of ECI. The ECI model has become increasingly popular in the United Kingdom since the early 2000s and is also used in Australia and New Zealand. rdf:langString
アーリー・コントラクター・インボルブメント方式(英語: Early contractor involvement、ECI方式)あるいは先行発注型三者協定方式とは、主たる元請業者がプロジェクトの初期段階で関与して設計段階への意見を提供する建設契約の一種である。これは、設計段階の終わりになってから請負業者を参加させる設計-入札-施工方式(DBB方式)とは対照的なものとなっている。このモデルにより、請負業者はスキームの設計に情報を提供し、バリューエンジニアリングの変更を提案可能となる。調査によると、ECIを使用することで、建設段階の時間で約10%、コストで7%の節約が達成可能とされる。 ECI方式は、2000年代初頭から英国で人気が高まっており、オーストラリアやニュージーランドでも採用されている。 rdf:langString
rdf:langString Early contractor involvement
rdf:langString ECI方式
xsd:integer 64637325
xsd:integer 1068710002
rdf:langString Early contractor involvement (ECI) is a type of construction contract where the principal contractor is engaged at an early stage in a project to offer input into the design phase. It is in contrast to the design–bid–build model where the contractor is only brought onboard at the end of the design phase. The model allows the contractor to have an input in the design of the scheme and suggest value engineering changes. Studies have shown that savings of around 10% in construction phase time and 7% in cost are achievable through the use of ECI. The ECI model has become increasingly popular in the United Kingdom since the early 2000s and is also used in Australia and New Zealand.
rdf:langString アーリー・コントラクター・インボルブメント方式(英語: Early contractor involvement、ECI方式)あるいは先行発注型三者協定方式とは、主たる元請業者がプロジェクトの初期段階で関与して設計段階への意見を提供する建設契約の一種である。これは、設計段階の終わりになってから請負業者を参加させる設計-入札-施工方式(DBB方式)とは対照的なものとなっている。このモデルにより、請負業者はスキームの設計に情報を提供し、バリューエンジニアリングの変更を提案可能となる。調査によると、ECIを使用することで、建設段階の時間で約10%、コストで7%の節約が達成可能とされる。 ECI方式は、2000年代初頭から英国で人気が高まっており、オーストラリアやニュージーランドでも採用されている。
xsd:nonNegativeInteger 7138

data from the linked data cloud