Darling Downs Power Station
http://dbpedia.org/resource/Darling_Downs_Power_Station an entity of type: Thing
Darling Downs Power Station is in Kogan, Western Downs Region, Queensland, Australia. It is 40 kilometres (25 mi) west of Dalby and owned by Origin Energy. The Darling Downs Power Station is adjacent to the QLD-NSW high voltage transmission Interconnector and the Powerlink Queensland R2 Braemar 330/275 kV Substation. Origin Energy developed the power station and the construction costs for the project were $780 million. Darling Downs entered commercial operation in July 2010. and was officially opened on the 5 November 2010 by Premier Anna Bligh.
rdf:langString
rdf:langString
Darling Downs Power Station
rdf:langString
Darling Downs Power Station
rdf:langString
Darling Downs Power Station
xsd:float
-27.11096382141113
xsd:float
150.9052124023438
xsd:integer
24603246
xsd:integer
967985993
<usDollar>
7.8E8
rdf:langString
Australia
rdf:langString
Opened
rdf:langString
July 2010
xsd:string
-27.11096388888889 150.90521666666666
rdf:langString
Darling Downs Power Station is in Kogan, Western Downs Region, Queensland, Australia. It is 40 kilometres (25 mi) west of Dalby and owned by Origin Energy. The Darling Downs Power Station is adjacent to the QLD-NSW high voltage transmission Interconnector and the Powerlink Queensland R2 Braemar 330/275 kV Substation. Darling Downs is a gas fired combined cycle gas turbine power station and is the largest of its type in Australia. It is powered by three 120 MW GE Frame 9E gas turbines and one 270 MW steam turbine, which generate a total of 630 MW of electricity. A 205 kilometre pipeline transports the gas to the station from gas fields near Wallumbilla. The power station uses less than 3% of the water that a traditional coal powered power station does by utilising air-cooled technology. Origin Energy developed the power station and the construction costs for the project were $780 million. Darling Downs entered commercial operation in July 2010. and was officially opened on the 5 November 2010 by Premier Anna Bligh.
rdf:langString
August 2007
rdf:langString
Yes
<megawatt>
630.0
xsd:integer
4
xsd:gYear
2007
xsd:nonNegativeInteger
3415
xsd:string
August 2007
xsd:gYear
2010
xsd:string
Opened
xsd:double
630000000.0
<Geometry>
POINT(150.90521240234 -27.110963821411)