Changi East Depot

http://dbpedia.org/resource/Changi_East_Depot an entity of type: Thing

Changi East Depot is a future train depot in Changi East, Singapore. At 57 ha (140-acre), the at-grade depot will house 70 to 80 trains of the Cross Island line (CRL) fleet. The depot will be located along Aviation Park Road near the Changi Exhibition Centre. Other facilities of the depot include the Operations Control Centre (OCC) for the CRL. First announced in 2019, the depot is expected to be completed in 2030 along with the first stage of the CRL. rdf:langString
樟宜東車廠(英語:Changi East Depot、马来语:Depot Changi East、坦米爾語:சாங்கி ஈஸ்ட் டெப்போ)是一個位於新加坡的純維修型(full maintenance)列車車廠,目前仍在規劃階段,預計於2030年起竣工並投入服務。 該車廠將會作未來跨島線的營運之用,包括一幢鐵路行政大樓、調車場(stabling yard)及維修工棚。跨島線的營運控制中心(Operation Control Centre,簡稱「OCC」)亦會設在行政大樓內。 該車廠將位於跨島線航空園地鐵站外。 rdf:langString
rdf:langString Changi East Depot
rdf:langString 樟宜東車廠
rdf:langString Changi East Depot
xsd:integer 61023862
xsd:integer 1116617361
rdf:langString Aviation Park Road, Tanah Merah Coast Road
rdf:langString Changi East Depot construction site in June 2022
xsd:integer 2030
rdf:langString Cross Island line
rdf:langString At-grade/underground
rdf:langString Changi East Depot is a future train depot in Changi East, Singapore. At 57 ha (140-acre), the at-grade depot will house 70 to 80 trains of the Cross Island line (CRL) fleet. The depot will be located along Aviation Park Road near the Changi Exhibition Centre. Other facilities of the depot include the Operations Control Centre (OCC) for the CRL. First announced in 2019, the depot is expected to be completed in 2030 along with the first stage of the CRL.
rdf:langString 樟宜東車廠(英語:Changi East Depot、马来语:Depot Changi East、坦米爾語:சாங்கி ஈஸ்ட் டெப்போ)是一個位於新加坡的純維修型(full maintenance)列車車廠,目前仍在規劃階段,預計於2030年起竣工並投入服務。 該車廠將會作未來跨島線的營運之用,包括一幢鐵路行政大樓、調車場(stabling yard)及維修工棚。跨島線的營運控制中心(Operation Control Centre,簡稱「OCC」)亦會設在行政大樓內。 該車廠將位於跨島線航空園地鐵站外。
xsd:nonNegativeInteger 8049

data from the linked data cloud