Cantonment MRT station
http://dbpedia.org/resource/Cantonment_MRT_station an entity of type: Thing
广东民地铁站(英語:Cantonment MRT Station,代號CC31)是新加坡地铁环线上的未来地铁站,位于新加坡本岛红山规划区。 它将坐落于丹戎巴葛火车站舊址附近。該站是环线第6阶段的一部分,预定于2025年完工。
rdf:langString
Cantonment MRT station is a future underground Mass Rapid Transit (MRT) station on the Circle line (CCL), situated in Bukit Merah planning area, Singapore, along Everton Road near the junction of Spottiswoode Park Road. This station is part of Stage 6 of the Circle line which will "close the circle" between the HarbourFront and Marina Bay stations.
rdf:langString
rdf:langString
Cantonment MRT station
rdf:langString
广东民地铁站
xsd:float
1.272814035415649
xsd:float
103.8366622924805
xsd:integer
48412967
xsd:integer
1105461817
rdf:langString
Yes
xsd:integer
100
rdf:langString
Singapore 089395
rdf:langString
Yes
rdf:langString
Yes
rdf:langString
left
rdf:langString
Old Railway Station, Spottiswoode Park
rdf:langString
Artist impression of Cantonment station Source: LTA
rdf:langString
Construction site of Cantonment station in August 2022
xsd:integer
1
rdf:langString
Singapore MRT/LRT system map
rdf:langString
Cantonment station in Singapore
rdf:langString
Cantonment
xsd:integer
300
rdf:langString
Singapore Rail central area
rdf:langString
SMRT Trains Ltd
rdf:langString
Bus, Taxi
rdf:langString
Yes
xsd:integer
2
rdf:langString
Underground
xsd:integer
2
rdf:langString
Future Mass Rapid Transit station
xsd:integer
230
xsd:string
1.272814 103.836659
rdf:langString
Cantonment MRT station is a future underground Mass Rapid Transit (MRT) station on the Circle line (CCL), situated in Bukit Merah planning area, Singapore, along Everton Road near the junction of Spottiswoode Park Road. This station is part of Stage 6 of the Circle line which will "close the circle" between the HarbourFront and Marina Bay stations. The station is built underneath and will be integrated with the historic Tanjong Pagar railway station, which ceased operations on 1 July 2011. Cantonment station will provide MRT access to the future Greater Southern Waterfront development. The station was to be opened in 2025 along with the other CCL6 stations, but was delayed to 2026 due to the COVID-19 pandemic.
rdf:langString
广东民地铁站(英語:Cantonment MRT Station,代號CC31)是新加坡地铁环线上的未来地铁站,位于新加坡本岛红山规划区。 它将坐落于丹戎巴葛火车站舊址附近。該站是环线第6阶段的一部分,预定于2025年完工。
rdf:langString
left
xsd:nonNegativeInteger
13890
rdf:langString
Singapore 089395
rdf:langString
100 Everton Road
xsd:string
Yes
rdf:langString
Old Railway Station, Spottiswoode Park
xsd:boolean
1
xsd:integer
1
xsd:nonNegativeInteger
2
xsd:string
Bus, Taxi
xsd:string
Yes
xsd:string
2 (1 island platform)
xsd:string
Underground
<Geometry>
POINT(103.83666229248 1.2728140354156)