Canterbury Provincial Railways
http://dbpedia.org/resource/Canterbury_Provincial_Railways
The Canterbury Provincial Railways was an early part of the railways of New Zealand. Built by the Canterbury Provincial government mainly to the broad gauge of 5 ft 3 in (1,600 mm), the railway reached most of the Canterbury region by the time the province was abolished in 1876. Edward Dobson, the Provincial Engineer from 1854 to 1868, was the designer and overseer.
rdf:langString
rdf:langString
Canterbury Provincial Railways
xsd:integer
6022870
xsd:integer
1057523786
rdf:langString
The Canterbury Provincial Railways was an early part of the railways of New Zealand. Built by the Canterbury Provincial government mainly to the broad gauge of 5 ft 3 in (1,600 mm), the railway reached most of the Canterbury region by the time the province was abolished in 1876. Edward Dobson, the Provincial Engineer from 1854 to 1868, was the designer and overseer.
xsd:nonNegativeInteger
6573