Bright Stalk Wind Farm

http://dbpedia.org/resource/Bright_Stalk_Wind_Farm an entity of type: SpatialThing

The Bright Stalk Wind Farm is a 57-turbine wind farm near Chenoa in northeastern McLean County in the U.S. state of Illinois. The turbines were designed to generate a maximum of 205 megawatts of electricity. The complex was completed in 2019 by EDP Renewables North America at a cost of more than $300 million, and entered operations in 2020. rdf:langString
rdf:langString Bright Stalk Wind Farm
xsd:float 40.71444320678711
xsd:float -88.70583343505859
xsd:integer 71828794
xsd:integer 1116435757
xsd:string 40.714444444444446 -88.70583333333333
rdf:langString The Bright Stalk Wind Farm is a 57-turbine wind farm near Chenoa in northeastern McLean County in the U.S. state of Illinois. The turbines were designed to generate a maximum of 205 megawatts of electricity. The complex was completed in 2019 by EDP Renewables North America at a cost of more than $300 million, and entered operations in 2020.
xsd:nonNegativeInteger 1718
<Geometry> POINT(-88.705833435059 40.714443206787)

data from the linked data cloud