Bright Stalk Wind Farm
http://dbpedia.org/resource/Bright_Stalk_Wind_Farm an entity of type: SpatialThing
The Bright Stalk Wind Farm is a 57-turbine wind farm near Chenoa in northeastern McLean County in the U.S. state of Illinois. The turbines were designed to generate a maximum of 205 megawatts of electricity. The complex was completed in 2019 by EDP Renewables North America at a cost of more than $300 million, and entered operations in 2020.
rdf:langString
rdf:langString
Bright Stalk Wind Farm
xsd:float
40.71444320678711
xsd:float
-88.70583343505859
xsd:integer
71828794
xsd:integer
1116435757
xsd:string
40.714444444444446 -88.70583333333333
rdf:langString
The Bright Stalk Wind Farm is a 57-turbine wind farm near Chenoa in northeastern McLean County in the U.S. state of Illinois. The turbines were designed to generate a maximum of 205 megawatts of electricity. The complex was completed in 2019 by EDP Renewables North America at a cost of more than $300 million, and entered operations in 2020.
xsd:nonNegativeInteger
1718
<Geometry>
POINT(-88.705833435059 40.714443206787)