Blue Mountain Faulkner 1 Geothermal Power Plant
http://dbpedia.org/resource/Blue_Mountain_Faulkner_1_Geothermal_Power_Plant an entity of type: Thing
Blue Mountain Faulkner 1 Geothermal Power Plant is a geothermal power plant located in Humboldt County, Nevada, United States. It is owned and operated by Nevada Geothermal Power Inc. Produced electricity is sold to NV Energy through a 21-mile (34 km) 120-kV transmission line to the transmission grid connection at Mill City, Nevada.
rdf:langString
rdf:langString
Blue Mountain Faulkner 1 Geothermal Power Plant
rdf:langString
Blue Mountain Faulkner 1 Geothermal Power Plant
rdf:langString
Blue Mountain Faulkner 1 Geothermal Power Plant
xsd:float
40.99527740478516
xsd:float
-118.1427764892578
xsd:integer
30100538
xsd:integer
1089400657
<usDollar>
1.8E8
rdf:langString
United States
rdf:langString
June 2016
rdf:langString
Nevada Geothermal Power
rdf:langString
domain on WP:BLACKLIST
rdf:langString
O
rdf:langString
October 2009
xsd:string
40.99527777777778 -118.14277777777778
rdf:langString
Blue Mountain Faulkner 1 Geothermal Power Plant is a geothermal power plant located in Humboldt County, Nevada, United States. It is owned and operated by Nevada Geothermal Power Inc. Produced electricity is sold to NV Energy through a 21-mile (34 km) 120-kV transmission line to the transmission grid connection at Mill City, Nevada. The plant was completed in October 2009. It has installed capacity of 50 megawatts (67,000 hp). As of November 2010, the plant operated at a net output of 37 megawatts (50,000 hp). It is a binary cycle geothermal plant, which uses a closed-loop heat exchange system. In this system hot geothermal water with an average temperature of 302 °F (150 °C) heats a secondary fluid, isobutane, which is vaporized and used to run a turbine. The geothermal water is supplied by five production wells and injected by six injection wells. There is program to add three new production wells. The depth of wells is 4,000–8,000 feet (1,200–2,400 m). The technology was supplied by Ormat Technologies. The well drilling contractors were ThermaSource and Ensign. The piping contractor was JFMPE and the reservoir engineering was handled by GeoThermEx Inc. The plant cost US$180 million, of which $57.9 million was funded under the American Reinvestment and Recovery Act.
rdf:langString
BC
xsd:integer
5
<megawatt>
50.0
xsd:nonNegativeInteger
3591
xsd:gYear
2009
xsd:string
O
xsd:double
50000000.0
<Geometry>
POINT(-118.14277648926 40.995277404785)