Birmingham Snow Hill to Wolverhampton Low Level Line
http://dbpedia.org/resource/Birmingham_Snow_Hill_to_Wolverhampton_Low_Level_Line an entity of type: Thing
The Birmingham Snow Hill to Wolverhampton Low Level Line was part of the Great Western Railway's London Paddington to Birkenhead Woodside route. As the name suggests, it ran between Birmingham Snow Hill and Wolverhampton Low Level in England. The line was dual-gauged, both 7 ft 1⁄4 in (2,140 mm) and 4 ft 8+1⁄2 in (1,435 mm) standard gauge.
rdf:langString
rdf:langString
Birmingham Snow Hill to Wolverhampton Low Level Line
rdf:langString
Birmingham Snow Hill to Wolverhampton Low Level Line
rdf:langString
Birmingham Snow Hill to Wolverhampton Low Level Line
xsd:integer
10653279
xsd:integer
1080028784
xsd:integer
16
rdf:langString
Dual /
rdf:langString
Soho and Winson Green station in 1967
xsd:integer
1992
xsd:integer
300
rdf:langString
West Midlands, England
rdf:langString
expanded
xsd:integer
1854
rdf:langString
Partially reopened for heavy rail and light rail
rdf:langString
The Birmingham Snow Hill to Wolverhampton Low Level Line was part of the Great Western Railway's London Paddington to Birkenhead Woodside route. As the name suggests, it ran between Birmingham Snow Hill and Wolverhampton Low Level in England. The line was dual-gauged, both 7 ft 1⁄4 in (2,140 mm) and 4 ft 8+1⁄2 in (1,435 mm) standard gauge. The line opened in 1854 and the final section was closed in August 1992, following the closure of other sections during the 1970s and 1980s. The opening was delayed for two months because a bridge collapsed near Winson Green, which caused chief engineer Isambard Kingdom Brunel to order strengthening on several other bridges. Passenger services had been discontinued in 1972, although parts of the line continued to be used by goods trains.
xsd:nonNegativeInteger
16
xsd:nonNegativeInteger
7368
xsd:gYear
1992
xsd:gYear
1854
xsd:string
Partially reopened for heavy rail and light rail