The Belconnen Bikeway is a 4.7 km (2.9 mi) commuter cycleway in the district of Belconnen, a northern suburb of Canberra, Australia. It is designated as route C3a (City to Belconnen via Town Centre) by Transport Canberra, and connects the Belconnen Town Centre to the University of Canberra, Radford College and Canberra Institute of Technology (CIT) Bruce campus, as well as to the broader cycle network. The bikeway is one of two routes diverging from the main C3 trunk route. It was the second fully separated off-street cycle route in Canberra to be completed, providing an east–west link across the Town Centre.
rdf:langString
rdf:langString
Belconnen Bikeway
rdf:langString
Belconnen Bikeway
xsd:integer
69759984
xsd:integer
1069779270
rdf:langString
rdf:langString
Coulter Drive, Florey to
rdf:langString
Haydon Drive, Bruce
rdf:langString
The Belconnen Bikeway passing under Totterdell Street on the old busway alignment
rdf:langString
C3a
xsd:integer
2020
rdf:langString
Belconnen Bikeway.jpg
rdf:langString
All seasons
rdf:langString
Asphalt
rdf:langString
The Belconnen Bikeway is a 4.7 km (2.9 mi) commuter cycleway in the district of Belconnen, a northern suburb of Canberra, Australia. It is designated as route C3a (City to Belconnen via Town Centre) by Transport Canberra, and connects the Belconnen Town Centre to the University of Canberra, Radford College and Canberra Institute of Technology (CIT) Bruce campus, as well as to the broader cycle network. The bikeway is one of two routes diverging from the main C3 trunk route. It was the second fully separated off-street cycle route in Canberra to be completed, providing an east–west link across the Town Centre. Resulting from a commitment made by the ACT Government during the 2016 Territory election campaign, construction began in 2019. During construction, 200 trees were planted to provide shade along the route. Stage 1 of the bikeway opened in November 2020, at a cost of $6.291 million, exceeding the estimated tender cost of $5.653 million.
rdf:langString
Easy
xsd:nonNegativeInteger
7081