The Bannerton Solar Park is a solar power station in the locality of Bannerton southeast of Robinvale in the Sunraysia district of Victoria. It generates up to 88MW of electricity to the National Electricity Market (NEM). Bannerton Solar Park is the second solar farm to be funded by the Clean Energy Finance Corporation (after the Gannawarra Solar Farm). It is also funded by Hanwha Energy Australia, parent company of Nectr. It uses 320,000 solar panels to generate 110MWDC/88MWAC of electricity. It has offtake agreements with Alinta Energy and Yarra Trams.
rdf:langString
rdf:langString
Bannerton Solar Park
rdf:langString
Bannerton Solar Park
rdf:langString
Bannerton Solar Park
xsd:float
-34.68999862670898
xsd:float
142.7799987792969
xsd:integer
58847386
xsd:integer
1027539368
xsd:integer
319406
rdf:langString
PV
rdf:langString
Australia
rdf:langString
Near Robinvale, Victoria
rdf:langString
Foresight Solar Australia
xsd:integer
2018
xsd:string
-34.69 142.78
rdf:langString
The Bannerton Solar Park is a solar power station in the locality of Bannerton southeast of Robinvale in the Sunraysia district of Victoria. It generates up to 88MW of electricity to the National Electricity Market (NEM). Bannerton Solar Park is the second solar farm to be funded by the Clean Energy Finance Corporation (after the Gannawarra Solar Farm). It is also funded by Hanwha Energy Australia, parent company of Nectr. It uses 320,000 solar panels to generate 110MWDC/88MWAC of electricity. It has offtake agreements with Alinta Energy and Yarra Trams. CIMIC Group company UGL Limited designed and built the solar farm, including single axis tracking system, substation and connection to the Powercor Australia grid. It is built on land unsuitable for Almond orchards. Bannerton is near the edge of the Victorian electricity grid. The Solar Farm exports electricity at 66kV into the distribution network to support the local grid in responding to the load imposed from irrigation in summer.
rdf:langString
October 2017
xsd:integer
88
xsd:gYear
2017
xsd:nonNegativeInteger
3932
xsd:string
October 2017
xsd:gYear
2018
<Geometry>
POINT(142.7799987793 -34.689998626709)