Aubin Grove railway station

http://dbpedia.org/resource/Aubin_Grove_railway_station an entity of type: Thing

Aubin Grove railway station (officially Aubin Grove Station) is a commuter railway station serving Atwell, Aubin Grove, Hammond Park and Success, which are suburbs of Perth, Western Australia. It is on the Mandurah line, which is part of the Transperth network, and is located immediately north of Russell Road in the median of the Kwinana Freeway. It has two platform faces on a singular island platform, which is linked to either side of the freeway by a pedestrian overpass. Services run every 10 minutes during peak and every 15 minutes between peak. The journey to Perth railway station is 23.8 kilometres (14.8 mi) and takes 21 minutes. The station has a bus interchange with four bus stands and seven regular bus routes. rdf:langString
rdf:langString Aubin Grove railway station
rdf:langString Aubin Grove
rdf:langString Aubin Grove
xsd:float -32.15499877929688
xsd:float 115.8579025268555
xsd:integer 45163815
xsd:integer 1111541358
xsd:integer 7
xsd:integer 4
rdf:langString Success and Atwell, Western Australia
rdf:langString Entrance building with information signs outside
xsd:integer 88
rdf:langString Aubin Grove bus station entrance in April 2017
xsd:integer 99671
xsd:integer 99672
rdf:langString RAG
rdf:langString Australia
rdf:langString Yes
rdf:langString from Perth
xsd:date 2017-04-23
xsd:integer 1948
xsd:integer 2
rdf:langString Ground
rdf:langString MAN
rdf:langString Transperth
xsd:integer 2
xsd:integer 3
xsd:string -32.155 115.8579
rdf:langString Aubin Grove railway station (officially Aubin Grove Station) is a commuter railway station serving Atwell, Aubin Grove, Hammond Park and Success, which are suburbs of Perth, Western Australia. It is on the Mandurah line, which is part of the Transperth network, and is located immediately north of Russell Road in the median of the Kwinana Freeway. It has two platform faces on a singular island platform, which is linked to either side of the freeway by a pedestrian overpass. Services run every 10 minutes during peak and every 15 minutes between peak. The journey to Perth railway station is 23.8 kilometres (14.8 mi) and takes 21 minutes. The station has a bus interchange with four bus stands and seven regular bus routes. Construction of the station was promised by both major political parties ahead of the 2013 Western Australian state election. A tender was released for the station's construction in July 2014, with a projected cost of $80 million for the whole project, including the purchase of two Transperth B-series trains. The design contract was awarded in February 2015 to a joint venture between Coniglio Ainsworth Architects and M. P. S. Architects. The scope of the project was broadened in April 2015 to include the widening of the Russell Road bridge over the freeway, which increased the project budget to $105 million. Construction on the station began in March 2016, and it was opened on 23 April 2017, with the final cost being $125 million.
xsd:nonNegativeInteger 37089
rdf:langString Kwinana Freeway
rdf:langString SuccessandAtwell, Western Australia
xsd:string 99671 (platform 1)
xsd:string 99672 (platform 2)
xsd:string RAG
xsd:string 88 bays
xsd:string 3
xsd:nonNegativeInteger 2
xsd:date 2017-04-23
xsd:gYear 2017
xsd:string 1,948 bays
xsd:string 2 platform faces on 1island platform
xsd:string Ground
<Geometry> POINT(115.85790252686 -32.154998779297)

data from the linked data cloud