Aubin Grove railway station
http://dbpedia.org/resource/Aubin_Grove_railway_station an entity of type: Thing
Aubin Grove railway station (officially Aubin Grove Station) is a commuter railway station serving Atwell, Aubin Grove, Hammond Park and Success, which are suburbs of Perth, Western Australia. It is on the Mandurah line, which is part of the Transperth network, and is located immediately north of Russell Road in the median of the Kwinana Freeway. It has two platform faces on a singular island platform, which is linked to either side of the freeway by a pedestrian overpass. Services run every 10 minutes during peak and every 15 minutes between peak. The journey to Perth railway station is 23.8 kilometres (14.8 mi) and takes 21 minutes. The station has a bus interchange with four bus stands and seven regular bus routes.
rdf:langString
rdf:langString
Aubin Grove railway station
rdf:langString
Aubin Grove
rdf:langString
Aubin Grove
xsd:float
-32.15499877929688
xsd:float
115.8579025268555
xsd:integer
45163815
xsd:integer
1111541358
xsd:integer
7
xsd:integer
4
rdf:langString
Success and Atwell, Western Australia
rdf:langString
Entrance building with information signs outside
xsd:integer
88
rdf:langString
Aubin Grove bus station entrance in April 2017
xsd:integer
99671
xsd:integer
99672
rdf:langString
RAG
rdf:langString
Australia
rdf:langString
Yes
rdf:langString
from Perth
xsd:date
2017-04-23
xsd:integer
1948
xsd:integer
2
rdf:langString
Ground
rdf:langString
MAN
rdf:langString
Transperth
xsd:integer
2
xsd:integer
3
xsd:string
-32.155 115.8579
rdf:langString
Aubin Grove railway station (officially Aubin Grove Station) is a commuter railway station serving Atwell, Aubin Grove, Hammond Park and Success, which are suburbs of Perth, Western Australia. It is on the Mandurah line, which is part of the Transperth network, and is located immediately north of Russell Road in the median of the Kwinana Freeway. It has two platform faces on a singular island platform, which is linked to either side of the freeway by a pedestrian overpass. Services run every 10 minutes during peak and every 15 minutes between peak. The journey to Perth railway station is 23.8 kilometres (14.8 mi) and takes 21 minutes. The station has a bus interchange with four bus stands and seven regular bus routes. Construction of the station was promised by both major political parties ahead of the 2013 Western Australian state election. A tender was released for the station's construction in July 2014, with a projected cost of $80 million for the whole project, including the purchase of two Transperth B-series trains. The design contract was awarded in February 2015 to a joint venture between Coniglio Ainsworth Architects and M. P. S. Architects. The scope of the project was broadened in April 2015 to include the widening of the Russell Road bridge over the freeway, which increased the project budget to $105 million. Construction on the station began in March 2016, and it was opened on 23 April 2017, with the final cost being $125 million.
xsd:nonNegativeInteger
37089
rdf:langString
Kwinana Freeway
rdf:langString
SuccessandAtwell, Western Australia
xsd:string
99671 (platform 1)
xsd:string
99672 (platform 2)
xsd:string
RAG
xsd:string
88 bays
xsd:string
3
xsd:nonNegativeInteger
2
xsd:date
2017-04-23
xsd:gYear
2017
xsd:string
1,948 bays
xsd:string
2 platform faces on 1island platform
xsd:string
Ground
<Geometry>
POINT(115.85790252686 -32.154998779297)