Aqua Line (Nagpur Metro)
http://dbpedia.org/resource/Aqua_Line_(Nagpur_Metro) an entity of type: Thing
The Aqua Line, also known as the East-West corridor, of the Nagpur Metro is a metro route of the mass rapid transit system in Nagpur, India. It was opened on 28 January 2020. The total length of the corridor is 19.407 km. with 21 stations from Prajapati Nagar to Hingna Mount View with a total distance of 19.407 km. All stations are elevated stations and Sitaburdi station is an Interchange Station. Average inter-station distance is 1.00 km approximately varying from 0.65 km to 1.29 km depending upon the site, operational and traffic requirements. This corridor originates from Prajapati Nagar and runs westwards, through Vaishnodevi Square, Ambedkar Square, Telephone Exchange, Chittar Oli Square, Agarsen Square, Doser Vaisya Square, Nagpur Railway Station, Sitaburdi, Jhansi Rani Square, Insti
rdf:langString
rdf:langString
Aqua Line (Nagpur Metro)
rdf:langString
Aqua Line
rdf:langString
Aqua Line
xsd:integer
60166532
xsd:integer
1107869911
xsd:integer
11
21
xsd:integer
25
rdf:langString
expanded
xsd:date
2020-01-28
rdf:langString
Operational
rdf:langString
The Aqua Line, also known as the East-West corridor, of the Nagpur Metro is a metro route of the mass rapid transit system in Nagpur, India. It was opened on 28 January 2020. The total length of the corridor is 19.407 km. with 21 stations from Prajapati Nagar to Hingna Mount View with a total distance of 19.407 km. All stations are elevated stations and Sitaburdi station is an Interchange Station. Average inter-station distance is 1.00 km approximately varying from 0.65 km to 1.29 km depending upon the site, operational and traffic requirements. This corridor originates from Prajapati Nagar and runs westwards, through Vaishnodevi Square, Ambedkar Square, Telephone Exchange, Chittar Oli Square, Agarsen Square, Doser Vaisya Square, Nagpur Railway Station, Sitaburdi, Jhansi Rani Square, Institute of Engineers, Shankar Nagar Square, Lad Square, Dharmpeth College, Subhash Nagar, Rachna (Ring road Junction), Vasudev Nagar, Bansi Nagar to Lomanya Nagar. The entire corridor is elevated. The DMRC in its Detailed Project Report (DPR) submitted to Nagpur Improvement Trust has suggested to start the construction work on both the routes simultaneously contradicting the prior suggestion of phase wise development.
rdf:langString
Elevated
<kilometre>
19.407
xsd:double
19407.0
xsd:nonNegativeInteger
11
21
xsd:nonNegativeInteger
8996
xsd:date
2020-01-28
xsd:gYear
2020
xsd:string
Operational