Amaranth Wind Farm

http://dbpedia.org/resource/Amaranth_Wind_Farm an entity of type: Thing

The Amaranth Wind Farm, also known as the Melancthon EcoPower Centre, is a 199.5 megawatt (MW) wind farm in Amaranth and Melancthon Township, near Shelburne, Ontario. The centre is owned and operated by TransAlta and at the time of opening, was Canada's largest wind energy installation. Construction of the Melancthon EcoPower Centre began with the 67.5 MW Phase I in 2005 and achieved commercial operation in March 2006. Construction of the 132 MW Phase II of the project began in 2007 and achieved full commercial operation in November 2008. rdf:langString
rdf:langString Amaranth Wind Farm
rdf:langString Amaranth Wind Farm
rdf:langString Amaranth Wind Farm
xsd:float 44.10010147094727
xsd:float -80.27089691162109
xsd:integer 20234433
xsd:integer 956898643
rdf:langString Canada
rdf:langString Wind farm in Melancthon
rdf:langString Amaranth and Melancthon Township, near Shelburne, Ontario
rdf:langString Operational
xsd:date 2006-03-04
xsd:string 44.1001 -80.2709
rdf:langString The Amaranth Wind Farm, also known as the Melancthon EcoPower Centre, is a 199.5 megawatt (MW) wind farm in Amaranth and Melancthon Township, near Shelburne, Ontario. The centre is owned and operated by TransAlta and at the time of opening, was Canada's largest wind energy installation. Construction of the Melancthon EcoPower Centre began with the 67.5 MW Phase I in 2005 and achieved commercial operation in March 2006. Construction of the 132 MW Phase II of the project began in 2007 and achieved full commercial operation in November 2008.
xsd:integer 2005
<megawatt> 199.5
xsd:gYear 2005
xsd:nonNegativeInteger 3708
xsd:string 2005
xsd:date 2006-03-04
xsd:gYear 2006
xsd:string Operational
xsd:double 199500000.0
<Geometry> POINT(-80.270896911621 44.100101470947)

data from the linked data cloud