Airport Central railway station
http://dbpedia.org/resource/Airport_Central_railway_station an entity of type: Thing
Airport Central railway station (officially Airport Central Station) is a station for underground commuter rail services at terminals 1 and 2 of Perth Airport in Western Australia. The station is one of three new stations that were built as part of the Forrestfield–Airport Link project, and is served by Transperth's Airport line services.
rdf:langString
rdf:langString
Airport Central railway station
xsd:integer
46365673
xsd:integer
1119936768
xsd:integer
99551
xsd:integer
99552
rdf:langString
[27377] Stand 1
rdf:langString
[28720] Stand 2
rdf:langString
Horrie Miller Drive, Perth Airport
rdf:langString
Airport Central Station viewed from concourse
rdf:langString
Australia
rdf:langString
Yes
xsd:integer
2
rdf:langString
yes
rdf:langString
rail-underground
xsd:integer
13
xsd:date
2022-10-09
rdf:langString
No
rdf:langString
Predicted
xsd:integer
6100
xsd:integer
1
2
xsd:integer
37
902
rdf:langString
collapsed
rdf:langString
Underground
rdf:langString
HWY
rdf:langString
Transperth
xsd:integer
2
xsd:integer
2
rdf:langString
Airport Central is located adjacent to the air traffic control tower at Perth Airport terminals T1 and T2.
xsd:integer
2
rdf:langString
Airport Central railway station (officially Airport Central Station) is a station for underground commuter rail services at terminals 1 and 2 of Perth Airport in Western Australia. The station is one of three new stations that were built as part of the Forrestfield–Airport Link project, and is served by Transperth's Airport line services. The contract for the Forrestfield–Airport Link, which consists of 8 kilometres (5.0 mi) of twin bored tunnels and three new stations, was awarded to Salini Impregilo and NRW Pty Ltd in April 2016. Construction on Airport Central Station began in March 2017 following preparatory works. By January 2018, excavation was complete, and in May 2018, the two tunnel boring machines (TBMs) reached the station after tunnelling from High Wycombe. The TBMs left the station tunnelling north-west the following month, and construction of the rest of the station started after that. In addition to the station, a 280-metre (920 ft) elevated walkway was built by Georgiou Group, linking the station to the airport's terminal T1. Originally planned to open in 2020, the line officially opened on 9 October 2022. It is served by trains every 12 minutes during peak hour, and every 15 minutes outside peak hour and on weekends and public holidays. At night, trains are half-hourly or hourly. The journey to Perth station normally takes 18 minutes.
rdf:langString
y
rdf:langString
Rail replacement service to High Wycombe station
rdf:langString
Rail replacement service to Perth station
rdf:langString
to Oats Street station via Belmont Forum Shopping Centre
rdf:langString
#009D58
rdf:langString
#C60C30
xsd:integer
3
rdf:langString
P
rdf:langString
All stations
rdf:langString
All stations, P
xsd:integer
2
xsd:nonNegativeInteger
46598
rdf:langString
Horrie Miller Drive,Perth Airport
xsd:string
2
xsd:nonNegativeInteger
2
xsd:date
2022-10-09
xsd:gYear
2022
xsd:string
No
xsd:nonNegativeInteger
6100
xsd:string
2 platform edges with 1island platform
xsd:string
Underground