2005 Chesapeake Bay crossing study
http://dbpedia.org/resource/2005_Chesapeake_Bay_crossing_study an entity of type: Artifact100021939
The 2005 Chesapeake Bay crossing study (also known as the Task Force on Traffic Capacity Across the Chesapeake Bay) was a study conducted by the state of Maryland in 2005 in order to explore the possibility of building a new crossing of the Chesapeake Bay. The crossing would either be an entirely new crossing that would complement the existing Chesapeake Bay Bridge and Chesapeake Bay Bridge-Tunnel in Virginia or would be an upgrade to the current Maryland crossing (by adding a third span).
rdf:langString
rdf:langString
2005 Chesapeake Bay crossing study
xsd:integer
5575817
xsd:integer
1109818782
rdf:langString
The 2005 Chesapeake Bay crossing study (also known as the Task Force on Traffic Capacity Across the Chesapeake Bay) was a study conducted by the state of Maryland in 2005 in order to explore the possibility of building a new crossing of the Chesapeake Bay. The crossing would either be an entirely new crossing that would complement the existing Chesapeake Bay Bridge and Chesapeake Bay Bridge-Tunnel in Virginia or would be an upgrade to the current Maryland crossing (by adding a third span). Since 2000, traffic congestion has become an increasing problem for the Chesapeake Bay Bridge. During the MdTA's 2004 fiscal year (July 1–June 30), it was utilized by approximately 25.8 million vehicles. Plans by Maryland to construct a third crossing of the Chesapeake Bay are currently in the preliminary stages. During the summer and fall of 2005, a specially-appointed task force met to discuss the pros and cons of building a new bridge in four different locations. Members of the task force included Maryland Secretary of Transportation Robert L. Flanagan who chaired the task force, and Maryland State Senator E. J. Pipkin.
xsd:nonNegativeInteger
7252