111 Street, Edmonton

http://dbpedia.org/resource/111_Street,_Edmonton an entity of type: Thing

111 Street is a major arterial road in south Edmonton, Alberta, Canada. The south leg of the LRT runs between the northbound and southbound lanes north of 23 Avenue. It passes by Southgate Centre and the former location of , now the location of the Century Park transit-oriented development. rdf:langString
rdf:langString 111 Street, Edmonton
rdf:langString 111 Street/James Mowatt Trail
xsd:integer 111
xsd:integer 22556315
xsd:integer 1107472303
xsd:integer 111
rdf:langString Crosses Blackmud Creek
rdf:langString South
rdf:langString North
rdf:langString Edmonton
rdf:langString Ellerslie Road,Anthony Henday Drive, 23 Avenue, 34 Avenue, Whitemud Drive, 51 Avenue
xsd:integer 0
xsd:double 1.2
xsd:double 2.1
xsd:double 2.4
xsd:double 3.3
xsd:double 3.7
xsd:double 4.1
xsd:double 4.6
xsd:double 5.7
xsd:double 6.5
xsd:double 6.8
xsd:integer 7
xsd:double 7.1
xsd:double 8.199999999999999
rdf:langString none
xsd:double 8.199999999999999
rdf:langString the City of Edmonton
xsd:integer 2
rdf:langString At-grade
rdf:langString Partial cloverleaf interchange ; exit 2 on Hwy 216
rdf:langString Continues as 127 Street
rdf:langString Passes Century Park station
rdf:langString Passes Southgate station
xsd:integer 12
xsd:integer 23
xsd:integer 34
xsd:integer 40
xsd:integer 51
xsd:integer 61
rdf:langString Saddleback Road / 29A Avenue
rdf:langString Southgate Centre access
xsd:integer 41
xsd:integer 61
rdf:langString 111 Street is a major arterial road in south Edmonton, Alberta, Canada. The south leg of the LRT runs between the northbound and southbound lanes north of 23 Avenue. It passes by Southgate Centre and the former location of , now the location of the Century Park transit-oriented development. 111 Street was originally part of the 1963 Metro Edmonton Transportation Study (METS), which proposed a downtown freeway loop and feeder routes, including three southern approaches from Highway 2 via 111 Street, Calgary Trail, and 91 Street / Mill Creek Ravine. As 111 Street was constructed, a wide right-of-way was integrated; however the freeway plan was ultimately cancelled. In the 2000s, the LRT Capital Line was expanded and constructed along the median and opened in 2010.
<kilometre> 8.2
xsd:nonNegativeInteger 6339
xsd:string 111 Street SW
xsd:double 8200.0
xsd:string North
xsd:string South

data from the linked data cloud